RE: How have you guys been doing?
Bill, the kitchen is mostly done save for the undercabinet lighting, crown molding and tile backsplash. I gutted it to the studs. Relocated the sink, dishwasher and stove. All new plumbing lines, gas line and wiring. Complete new layout. Should have been built that way but the builder was a cheapskate. With that mostly out of the way I can start to concentrate on TAXIDERMY, WOOHOO!