HuntingNet.com Forums - View Single Post - About those CVA muzzleloaders
View Single Post
Old 08-04-2015 | 11:50 AM
  #103  
bronko22000's Avatar
bronko22000
Boone & Crockett
 
Joined: Jan 2004
Posts: 12,823
Likes: 5
From: Eastern PA
Default

Originally Posted by ram2
You have never worked in the auto industry. Sampling 1-3 parts per shift is typical. And 1 shift produces several hundred parts.
No Ram I have never worded for the auto industry. I worked for the USN where QC is much more stringent and lot sizes are smaller. I would think the auto industry relies on stastics to determine the amount of samples that need to be taken and adjust this quantity based on the results of the sampling inspection. And there are quite a few recalls on autos also. Heck my vehicle has had 3 recalls in the 4 or 5 years since I've owned it.
bronko22000 is offline