Originally Posted by
bronko22000
First if they say that inspect 1 out of every 25 barrels, that is a a pretty weak sample size. Even a moderate sample would be 8.
You have never worked in the auto industry. Sampling 1-3 parts per shift is typical. And 1 shift produces several hundred parts.