All of my lock-ons are strapped onto the tree and then on the support bars I weld a cross piece of steel. I then drill a 1/2" hole and put a grade 8, 8" steel lag bolt into the tree. And when they are 25' feet up, its not a place to start trying to figure out what is going to work or not. Been doing it for 10 years and so far, so good.