RE: Pa doe permits.. anyone know the deadline?
That does not explain why the PGC experts disagree with your observations. Their survey plots are spread out over the entire WMU and their location is kept secret in order to prevent tampering.All of the plots have adequate sunlight, so if the plots aren't regenerating at 12 PS DPSM, then isn't the obvious solution to reduce the herd in 2G to 5 DPSM or less?