Ok day 2
When I got home this morning I done a mock lay up to make sure there was no gap where the fade out and limb lams meet.
Then I put all the lams into the heat box for about an hour then removed them and let them cool to room temp.
Next was to put some plastic wrap on the form as excess glue oozes out and without the plastic the bow will stick to the form giving it a
VERY heavy draw weight
Once the lams had been in the heat box for an hour I took them out and layed them in the order I was going to use them.
Now the really fun part starts the glue up

The glue I am using is a 2 part epoxy called smooth on and I will tell ya this it is some slippery crap[8D]
I usually mix way too much and today was no exception
Once everything is glued up and on the form I use filament tape to hold everything together with another layer of plastic wrap on so the air hose does not stick to the pressure strips,then put the top of the form and air hose on then put 60lb of air pressure into the hose.
Now the form goes into the heat box for 4 hours or so.
Seeing I still had a lot of epoxy left over I also glued the yellow heart and Leopardwood together for the overlay and put into the heat box as well.
I did not take a pic of them before going into the box but this is what it looks like.
They should look real good on the from of the riser but I guess I will find that out in 4 hours or so