RE: Mineral licks.......how long?
Hey guys....
I DID dig the holes.....and I DID use the formula from the other thread (the same one repeated on this thread).I followed the instructions to a "T". I have (2) places where the minerls were mixed with the soil in a 3'x3' area.....and the rest was put in hollowed out stumps (that had access from a side I tore off). I didn't put out rocks or blocks.
I'm going to check them, today. They've been in place for 5 nights, now......and I shoud have one of my trail-cams to put out, this evening. We've also had 3 POUNDING rain storms on them. I got lucky, there. I'll report back, tomorrow.
Jeff