RE: Plot Master
I would like to know how long this was worked before it looked like this.
I bought one of the damn things and it may as well be a boat anchor. Unless there is a serious amount of sand in a field it's a waste of time with the P-master. I have clay soils and usually I can get a strip 4' wide worked up in 15 passes.
Mine's in the barn, I'll let it go cheap.