Setting Up a QAD.. or other Drop Away Rest
#12
Nontypical Buck
Thread Starter
Join Date: Nov 2006
Location: Where the ducks don't come no more
Posts: 4,420
RE: Setting Up a QAD.. or other Drop Away Rest
ORIGINAL: kwilson16
Great post, Andy!
I recognize the interior of Wilcox's Bait and Tackle.
Great post, Andy!
I recognize the interior of Wilcox's Bait and Tackle.
#14
Nontypical Buck
Thread Starter
Join Date: Nov 2006
Location: Where the ducks don't come no more
Posts: 4,420
RE: Setting Up a QAD.. or other Drop Away Rest
ORIGINAL: Black Stick
I copied and pasted this into a word document. Hope you don't mind SC.
I copied and pasted this into a word document. Hope you don't mind SC.
Not at all. It was for the benefit of anyone and everyone. Hope you find it useful... thats why its here!
#17
Nontypical Buck
Join Date: Feb 2007
Location: Balt, MD (orig: J-town,PA) The bowels of Hell!!!
Posts: 2,188
RE: Setting Up a QAD.. or other Drop Away Rest
Swamp,
Great demo. However, I find it easier to place a few knots, using serving, where you want the cord to stop on the down cable. Then, run the cord through the down cable below the knots and draw the bow. Because of the pressureon the cordduring the draw the cord will only pull through the down cable to the spot that has the rest at 90 from the riser shelf. Then, I cut off the cord and melt the end to a ball. Very simple and very fast.
Great demo. However, I find it easier to place a few knots, using serving, where you want the cord to stop on the down cable. Then, run the cord through the down cable below the knots and draw the bow. Because of the pressureon the cordduring the draw the cord will only pull through the down cable to the spot that has the rest at 90 from the riser shelf. Then, I cut off the cord and melt the end to a ball. Very simple and very fast.