ALL IN A HARD DAYS WORK
#1
Thread Starter
Join Date: Jul 2004
Location:
Posts: 33
ALL IN A HARD DAYS WORK
I can't wait for Oct 1. I've been getting ready for bow season at work. I work in a machine shop so I have use of everything I need to build stands and other things. Last week I built a 19 foot ladder stand. This week I will be working on a disc to pull behind my four wheeler and I am getting metal together to build a tripod stand. I am starting to love this job. All those hours of standing over a hot welder will pay off when I can start slinging arrows.
#4
Thread Starter
Join Date: Jul 2004
Location:
Posts: 33
RE: ALL IN A HARD DAYS WORK
I bet our total season( bow rifle muzzle loader) lasts longer than yours besides it to hot sept 15 to be shootin deer here. Its still to warm in Oct but if its time its time so Oct 1 I'm in the woods.